Installed a dedicated 50-amp circuit with 250 feet of conduit for a 12kW Tesla EV charger in a 3,860 sqft Bellevue residence. Completed all electrical work including conduit installation and circuit wiring, followed by a final inspection approval on May 14, 2026.
Bellevue
Residential Lighting Upgrade and EV Charger Installation
Installed additional LED can lights and flood lights on garage doors. Completed electrical panel work including a 100 amp subpanel upgrade. Corrected EV charger wiring to meet NEC standards for safe and reliable operation.

